Posted on 2 Comments

Productive

There are lots of things coming up that I can’t tell you about just yet (but I will soon, I promise!), so I thought I would share this week’s progress with my various projects.

Yesterday I managed to pick the blackcurrants – I got 7.5 lbs of fruit off our one bush, which shows that netting these and the redcurrants has really made a difference. Again, it wouldn’t all fit in the freezer, so I used just over half to make a batch of jam. I do need to get some more jam jars – or make sure we use up some of the preserves I’ve already made. I thought the 8 jars I could find wouldn’t be enough, so I washed and sterilized a Kilner jar that had been storing dried fruit and thank goodness I did as that got filled up as well! It took hours for the Kilner jar to cool down and as there was some condensation on the lid I thought that would be the best one to open first. It tastes really good – rather like super concentrated Ribena…

The gooseberries have been hiding under their leaves and are very ripe, but if I get them picked in the next day or so we should be able to use them for crumble.

We also harvested our first round courgette! They are supposed to be picked when the size of tennis balls, so this one was a little on the large side, but it tasted fabulous with pesto pasta.

The few lonely broad beans in the colander are all that were on the plants in the garden (they went into the same meal as the courgette). When I picked them, the whole plant came out of the ground as though the roots hadn’t properly taken since being planted out. Next year I shall sow the broad beans directly into the ground and do it much earlier.


Beyond the garden, my spinning is complete – there are some irregular sections, but overall I’m very happy with it. Velvet Sixpence‘s Polwarth fibre has been a delight to work with.

I’m thinking about adapting my Fiery Dragon Skin Cowl pattern to include a range of yarn weights and this might be a good yarn to knit a chunky sample with!


Also completed is my lace-weight Marianne Half Hap shawl! I cast off this morning.

Straight off the needles it’s rather frilly and uneven, but that’s because it’s not yet been blocked. Blocking will happen tomorrow morning and I am going to be super careful with it as the gorgeous yarn, Northampton Shear Shetland Lace from RiverKnits, is a single ply with some very very fine sections. I think it will be more a case of easing and pushing the knitting while it’s damp, rather than pulling and stretching.

This means I can cast on another new sample of an existing design as part of my Summer KAL – this one will be Amy March Shawl using two beautiful skeins dyed by The Yarn Artist.


My Mystical Lanterns crochet blanket is now three strips wide and I started the fourth strip today – two and a half motifs are done on this one so far. I’m really enjoying this design by Janie Crow – especially as I’ve now got the main motif memorised which makes progress faster.

It’s a great stash-buster. The central ring of the motif uses hardly any yarn, so if I have a colour I think I have virtually nothing of I can still get it into one or two more motifs.


Progress has also been made towards the Pop-Up Wool Show that is happening at Hulme Hall, Port Sunlight in a month’s time (19th August, 2023) – yay! I’ve printed out the extra patterns that I needed.

Don’t worry, this isn’t everything I’m bringing, it’s just a top-up print to make sure I have enough of each design with me! Later this week I shall be sanding, waxing and burning stitch marker pots, and knitting/sheep themed coasters.


Now I’m off to a leaving do. It’s for my lovely wife who, after seventeen years in the role, is in her final week of term as a primary headteacher.

Whatever you’re doing this week, I hope some of it brings you joy. Take care, K x

Posted on Leave a comment

One Stitch at a Time


Well, it’s been quite a week. Lichfield came out in The Knitter last Thursday and I’ve had some lovely comments about it.


I’m coming to the finishing stages of my Treasure Chest Socks design. The largest size is being added and knitted and I’m working my way through the gusset decreases currently. That will be out in October.

I do need a name for this design still. With some designs the name actually comes first because of the inspiration (as with Lichfield), but with others it’s one of the last things to do. I might even ask for suggestions…!


Tomorrow sees the halfway point of my Summer KAL. There’s another Zoom – this one is a knit and knatter, 12th July, 7.30-9pm BST, and just as before, the tickets are available online for free with a £3 paid option should the mood take you that way. If you’re knitting something of mine and you’d like to join us it would be wonderful to see you there.

I’m more than halfway through my Marianne Half Hap (my SummerKAL project), though I always forget how long a knitted on edging can take. There are some super fine sections in this second skein of yarn so I will need to be extremely careful when blocking it. I don’t want any nasty popping or snapping of yarn to occur!


I’ve also realised that it’s only five and a half weeks until the Pop-Up Wool Show in Port Sunlight. That means there are spreadsheets to sort out, patterns to print, kits to put together and wood to sand, oil and burn.


I picked the redcurrants! Well, most of them. After the fourth massively overloaded colander went into the sink I decided the birds could have the rest. The netting is now just on the blackcurrants which are waiting patiently for their turn.

I think I got about 10lbs of fruit, after pulling the berries off the stalks. I was going to freeze it all, but there just wasn’t room in the freezer for that much, so I turned 6lb of berries into jelly and the rest is frozen.


I’m doing quite well with my plans for this month so far. I finished reading Melmoth. I have also finished spinning the singles of the Polwarth dyed by Velvet Sixpence and I shall ply it once I get back home.

I’ve spun the whole braid onto one bobbin (didn’t plan ahead), and, as I want a two ply yarn, I think I shall bracelet ply it, which means I will need to ply the whole thing in one go.


I finally did some embroidery. I realised that my plan of completing two 10 x 10 squares of the chart in a month was a little unambitious. At that rate I will still be stitching this piece in 2045! So I have completed 6 squares of the chart and I’m going to finish the whole of the bottom row this month as well if I can.

Even if I complete one whole row of 10 x 10 squares per month that will still take until about Christmas 2024. Crikey.


I’m at Mum’s again for a few days and she has completed the bag for me that was originally supposed to be a folder cover. It’s really rather amazing. I’m going to add a couple of magnetic closures to the inside top.

There were two partly completed folder covers and Mum wrote out the instructions for me to do the other one!

I also was allowed to have a look through one of her fabric boxes and choose some fabric to take home – there will be lots more sewing in my future!

Do you ever feel you have more things you want to do than there is time to do them in? I do, but I’m finally realising that I can only do is what I can, one stitch at a time.

Take care one and all. Have a good week and do some stuff that makes you happy, K x