Well, it’s been quite a week. Lichfield came out in The Knitter last Thursday and I’ve had some lovely comments about it.


I’m coming to the finishing stages of my Treasure Chest Socks design. The largest size is being added and knitted and I’m working my way through the gusset decreases currently. That will be out in October.


I do need a name for this design still. With some designs the name actually comes first because of the inspiration (as with Lichfield), but with others it’s one of the last things to do. I might even ask for suggestions…!
Tomorrow sees the halfway point of my Summer KAL. There’s another Zoom – this one is a knit and knatter, 12th July, 7.30-9pm BST, and just as before, the tickets are available online for free with a £3 paid option should the mood take you that way. If you’re knitting something of mine and you’d like to join us it would be wonderful to see you there.
I’m more than halfway through my Marianne Half Hap (my SummerKAL project), though I always forget how long a knitted on edging can take. There are some super fine sections in this second skein of yarn so I will need to be extremely careful when blocking it. I don’t want any nasty popping or snapping of yarn to occur!


I’ve also realised that it’s only five and a half weeks until the Pop-Up Wool Show in Port Sunlight. That means there are spreadsheets to sort out, patterns to print, kits to put together and wood to sand, oil and burn.
I picked the redcurrants! Well, most of them. After the fourth massively overloaded colander went into the sink I decided the birds could have the rest. The netting is now just on the blackcurrants which are waiting patiently for their turn.
I think I got about 10lbs of fruit, after pulling the berries off the stalks. I was going to freeze it all, but there just wasn’t room in the freezer for that much, so I turned 6lb of berries into jelly and the rest is frozen.


I’m doing quite well with my plans for this month so far. I finished reading Melmoth. I have also finished spinning the singles of the Polwarth dyed by Velvet Sixpence and I shall ply it once I get back home.

I’ve spun the whole braid onto one bobbin (didn’t plan ahead), and, as I want a two ply yarn, I think I shall bracelet ply it, which means I will need to ply the whole thing in one go.
I finally did some embroidery. I realised that my plan of completing two 10 x 10 squares of the chart in a month was a little unambitious. At that rate I will still be stitching this piece in 2045! So I have completed 6 squares of the chart and I’m going to finish the whole of the bottom row this month as well if I can.


Even if I complete one whole row of 10 x 10 squares per month that will still take until about Christmas 2024. Crikey.
I’m at Mum’s again for a few days and she has completed the bag for me that was originally supposed to be a folder cover. It’s really rather amazing. I’m going to add a couple of magnetic closures to the inside top.





There were two partly completed folder covers and Mum wrote out the instructions for me to do the other one!

I also was allowed to have a look through one of her fabric boxes and choose some fabric to take home – there will be lots more sewing in my future!

Do you ever feel you have more things you want to do than there is time to do them in? I do, but I’m finally realising that I can only do is what I can, one stitch at a time.
Take care one and all. Have a good week and do some stuff that makes you happy, K x